Process + Schedule

The design methodology implementation for this project includes the following phases of design:

VISION: Identify the Challenge In this intensive project kickoff, key members of Little’s Project Team work directly with the Catawba College Team to clarify known Goals and Objectives for the project.

DISCOVER: Gain Insight Once the team has completed the Visioning step and defined Goals and Objectives of the project, we identify special knowledge needed to develop the best, most thoughtful design response. This becomes our Knowledge Initiative for the project.

CREATE: Find an Optimal Solution With basic research completed, we combine our new knowledge with Catawba College’s knowledge and our own experience and, in a collaborative charrette format, we will generate conceptual directions for the master plan. Each concept is evaluated against the degree to which it solves for client goals and its potential for innovation and design excellence. By doing so, we are interactively exploring new ideas and multiple options. Then, by narrowing down those options the preferred conceptual direction is established, which drives design decisions throughout the development of the project.

Part One

Visioning, Engagement, and Collection of Information

June 2023

  • Vision session with Executive Leadership
  • Meet the team and understanding of expectations
  • Share vision of master plan goals and summary with Executive Committee
  • Follow up meetings with other key constituents (1 hour session)

July 2023

  • Begin basic facility assessments and gathering information on infrastructure
  • Gathering of data from the college and create base documents

August 2023

  • Analyze data and all materials
  • Gather utilization information and begin utilization study
  • Share updates with the Executive Committee

September 2023

  • Share findings with the Executive Committee
  • Engagement session with stdents with Credo and Little
  • Share preliminary design, sustainability, and infrastructure strategies with the Executive Committee
  • Share facility assessments
  • Share highlights with the Executive Committee

Part Two

Master Plan Strategies

October 2023

  • Share utilization analysis and impact on MP
  • Begin developing master plan design strategies
  • Share findings from student sessions

November 2023

  • Review and revise master plan design strategies

Part Three

Refinement and Execution of the Final Master Plan

November 2023

  • Review revisions with the Executive Committee
  • Share with Board of Trustees

December 2023

  • Review revised master plan design strategies
  • Review refined sustainability strategies and infrastructure strategies

January 2024

  • Begin finalizing master plan and begin cost and sequencing strategy
  • Explore planning phase of student housing (assuming endorsement of the master plan strategy)

February 2024

  • Present first pass at sequencing and cost
  • First pass at final master plan as well as sustainability and infrastructure strategies

March 2024

  • Refine cost/order of magnitude and sequencing

April 2024

  • Finalize with Executive Committee
  • Work on final master plan document

June 2024

  • Prepare and finalize book
  • Begin design work on initial phases of master plan (could happen sooner)